Versions Compared

Key

  • This line was added.
  • This line was removed.
  • Formatting was changed.

...

The first month in the data collection period includes the CS (current situation), ML (near term projection of three months), ML2 (medium term projection of six months). The outlook collection date is the first date from the current state through four months. A new collection date begins after four months.

Internal data

Separate Source Documents designated as FEWS NET/USAID Only with must exist in FDW before internal data is uploaded. The naming convention for these Source Documents is [Report type] (FEWS NET/USAID Only), [Country]. When preparing a file for internal IPC data, ensure the column headings specify that the data is internal (for example, FSO Internal rather than FSO). This helps is necessary for FDW to determine the correct Source Document to use for the data.

...